1, shaft leakage The rotary shaft includes a clutch handle shaft of a shift lever shaft of a starter and a decompression shaft of the engine. If the shaft and hole wear each other, the gearbox shaft of the starter and the handle shaft of the clutch can be cut out of the seal ring groove on the lathe. At this time, it is only necessary to install a seal bite having a corresponding size. If the aging of the apron due to the decompression shaft fails, replace the new apron. 2, oil leakage switch Including water valves, tank switches, and petrol switches. If the ball valve is worn or rusted, the rust between the ball valve and the seat hole should be removed and a suitable steel ball should be used instead. If the packing and fastening threads are damaged, the fasteners should be repaired or replaced and the packing replaced. If the conical joint surface is not tight, it can be ground with fine valve sand and oil. 3, head leakage Tubing fittings include two major categories of cone-joint and hollow-bolt fittings. Cone-joint pipe joints include pipe joints at both ends of the pressure gauge, one end of the gasoline pipe, two ends of the high-pressure fuel pipe, and the coarse fuel filter to the end of the oil pump. If the joints are deformed or cracked due to abrasion, they can be sawn off and replaced. Good joint welding. If the connector of the low-pressure fuel pipe is damaged, the bell mouth can be sawed out and the bell mouth can be made again. If the thread is damaged, it should be repaired or replaced with a new one. Hollow bolt fittings include coarse fuel, fine filters, and low-pressure fuel injection fittings for injection pumps. If the gasket is damaged or the assembly is uneven, use a plastic gasket, or use a flat file, or use sandpaper to flatten it. Severely, the milling machine can be used for milling. If there is a pull mark on the assembly plane of the pipe joint, the joint assembly plane and gasket can be ground with fine sandpaper or using oilstone. If there is any foreign matter on the mating surface, the machine body should be cleaned during assembly and the joint fixing bolt should be evenly tightened. 4, oil plug leaks Plug oil plugging oil includes cone plugging, plugging and process plugging. If the oil plug screw is damaged or unqualified, it should be replaced with a new one; if the screw thread is damaged, the size of the screw hole can be increased and the new oil plug can be fitted; if the taper plug wears out, tapping can be changed to flat after tapping. Plug, then add pad for reuse. 5, seam leakage Plane seams include two planes sealed with paper pads, asbestos pads, and cork. If the contact surface is uneven or there are grooves or burrs on the contact surface, according to the degree of unevenness of the contact surface, the use of assorted files, fine sandpaper, or oil stone, can be used to flatten the machine. In addition, the assembled gaskets must be qualified and cleaned at the same time. If the bolt is loose, tighten the fixing bolts. It is believed that many agricultural operators have been troubled by the above five oil leakage problems. Therefore, under the premise of promoting production, ensuring that the use of tractors solves the problem of oil leakage in various parts of the aircraft, the above five solutions will also affect you. Helped.
The ya Pears are native to China. The ya pears are juicy with white flesh. The Ya Pear has a thin yellow skin and has the same shape as the common pear. The Fresh Ya Pear is crunchy and has a sweet , honey like taste.
1. Commodity Name: Ya Pear
5. Conveyance: Loading quantity for each 40`HR depending on its detailed packing.
6. Transporting and storing temperature: 0°C
Fresh Ya Pear Fresh Ya Pear,Ya Pear,Fresh Yellow Ya Pear,Sweet Fresh Ya Pear JINING FORICH FRUITS & VEGETABLES CO., LTD. , https://www.forichgarlic.com
3. Packing:
a) Inner packing: each piece is wrapped with tissue paper and foam net
b) Outer packing:
1) 4.5kg/carton: 20, 22, 24pcs 2) 9kg/carton: 40, 44pcs
3) 10kg/carton: 36, 40,44,48pcs 4) 18kg/carton: 72, 80, 96pcs
5) or according to clients' requirements.
4. Supply period: End August to next April