1. Before use, first check whether the fasteners are tightened, whether the rotating part is flexible, whether there is oil in each bearing, and whether the shelling machine is placed smoothly. In order to ensure the safety of the operator, it is also necessary to protect the outer shell of the motor (reliably connect the outer shell of the motor to the grounding body).

2. Before applying electricity, apply manpower to turn the shelling machine a few laps. If there is a crash sound, you should find out the reason and reapply power.

3. After the power is turned on, try running and pay attention to whether the rotation of the rotor is correct. After the motor is started, the rotation of the rotor should be in the same direction as that indicated on the implement. Let idling for a few minutes first, observe whether there are abnormal noises, run normally and steadily, and then put peanuts into the hopper quantitatively, evenly and continuously.

4. There is also a requirement for the degree of dry and wet peanuts, that is, peanuts should not be too dry or too wet. Too dry, the broken rate of peanuts is high; too wet and shelling will slow down. In winter, peanuts stored in rural areas are generally dry. To make them dry and wet, the following methods can be used: Apply evenly 15 kg of warm water to 100 kg of peanuts, cover them with plastic film for about 10 hours, and then dry in the sun. The shelling starts in about 1 hour. It takes only about 6 hours to cover it with plastic film in other seasons. The rest of the procedure is the same.

5, shelling, peanuts should be fed evenly, moderately, and absolutely not allowed to have iron, stone and other debris mixed in, in order to prevent breaking peanuts or cause mechanical accidents. When the peanuts cover the screen side, you can open the outlet switch.

6. The appropriate screen should be selected according to the size of peanuts.

7, to solve the increase in peanut shell method is to move the motor down to tighten the fan belt, increase the amount of hair.

8. After the shelling machine is used, before storing the machine, remove dust, dirt, and debris from the inside of the clean mechanical surface. Then, clean the bearing of each part with diesel oil and dry it with grease. The parts should be painted again. After the paint is dry, the machine is covered and stored in a dry warehouse. The belt should be removed and hung on the interior wall that is not exposed to the sun.

Our Hospital Equipment for Operation Table,Shadowless Lamp,Ultrasonic Neublizer , Hospital Bed , Incubator /ratiant warmer , Oxygen Inhalter , Suction Machine , Baby Carriage ,Bedside cabinet , Hospital Trolleyand so on , Products is good in quality and competitive in price . We are manufacturer and supplier Hospital Equipment Products following your specific requirement. We are looking forward to your E-mail and establishing cooperative relationship with you! We would provide professional Hospital Equipment with good services for you!

Hospital Equipment

Radiant Warmer, Operation Table, Hospital Trolley, Shadowless Lamp, Incubator Warmer

Ningbo Cland Medical Instruments Co., Ltd. , https://www.cland-med.com